logo

Shandong Wanzhida New Materials Technology Co., Ltd. bill@wanzhidasteel.com 86--18606330681

Shandong Wanzhida New Materials Technology Co., Ltd. Company Profile
products
Home > products > Metal Formwork > Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds

Product Details

Place of Origin: Shandong

Brand Name: Wanzhida

Model Number: SSB 1

Document: Company booklet_compress.pdf

Payment & Shipping Terms

Minimum Order Quantity: 20 ton

Price: 3500 - 3800 USD Per Ton

Packaging Details: Packing in Containers or Bulk

Delivery Time: 30 Days

Payment Terms: L/C,T/T

Get Best Price
Product Details
Highlight:
Material:
Steel
Specification:
TBD
Delivery Time:
15-45 Days
File Formats:
Pdf, Dwg
Sample Time:
7 Days If Standard Parts We Have
Processing:
Cutting,welding,assembly,galvanizing,painting,flaw Detection,transporting
Material:
Steel
Specification:
TBD
Delivery Time:
15-45 Days
File Formats:
Pdf, Dwg
Sample Time:
7 Days If Standard Parts We Have
Processing:
Cutting,welding,assembly,galvanizing,painting,flaw Detection,transporting
Product Description

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds


 Customer praise: high precision, detachable modules, simple modeling, recyclable 300 times, low-carbon and environmentally friendly, worry-free and money-saving, energy saving, environmental protection, and easy installation. passed CE certification. It is suitable for Civil and commercial housing construction,schools, parks, hosipital, ,squares, etc. It has a warranty period of 3 years. Moreover, we can provide various styles to meet your needs.

Advantages of Aluminium Formwork

We offer the  aluminum profiles for making formwork system

6061-T6 aluminum formwork system concrete forming system concrete formwork

1. total system forms the complete concrete structure
2. convenient
3. easy operation
4. high quality
5. light and great flexibitity
6. durable, made of special alloy aluminum

7. no need for rehabilitation, no risk of rust and corrosion

8. fast installation owing to its special design
9. speed of construction-4-days each floor construction cycle.
10. Formwork can be re-used over 300 times.
11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.


Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 0

Speed

Due to its easiness of assembly, 4 days cycle is guaranteed compared to 7~9 days cycle for conventional formwork system.


Quality

Due to the smooth surfaces and accurately dimensioned panels, no need for plastering or remedial work after concrete casting.


Safety

No need to remove props and prop heads when dismantling slab panels.


Easy assembly

Due to its easiness of assembly, no need for skilled workers nor carpenters.


All-in-one system

With Aluminum Formwork System, brackets for wall, slab, elevator and external working platform are provided.


Mobility

The formwork to the next level can be done through material transfer box on the slab without using the crane.


Freedom of design & jobsite planning

Unlike tunnel or flying formwork, Our Aluminum Formwork System is a "modular" formwork. It can be used for any architectural and structural layout.
6 floors per month (4 days per floor + 6 days for uncontrollable factors e.g. access problems,unavailability of workers and etc).


Durability

A state of the art manufacturing technology using aluminum alloy (6061-T6) material yields its repetitive use (up to 250 times) and results in decreasing construction cost compared to conventional formwork.

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 1

Ten Advantages of Aluminum Forming System  

1. Light weight, high strength
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.
2. Various sizes, high accuracy
The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.
3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.
4. Long time used
With the lowest average lost, aluminum formworks can be used up to 300 times.
5. Wide range used
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.
6. Excellent quality
The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.
7. High efficiency
According to different climatic conditions, the formworks can be removed in 18-36 hours.
8. Recyclable value
The used aluminum material is of greater recyclable value,several times higher than steel.
9. Independent support system
The gap between the formwork support is totally enough for passing, moving and pulling.
10. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

NO.
Reference
Aluminum Formwork
Wood Formwork
1
Material cost (Included Support)
$183-216/m2
$13--16/m2
2
Turnaround times
200times at least
3-5times
3
assembling and dismantling labor cost
$3.6-4.2/m2
$4.2-4.7/m2
4
recovery value
$67/m2
$0.8/m2
5
subtotal arifical materials
$4.4-4.9/m2
$7.5-8/m2
6
leveling the wall plastering labor cost
$0.4/m2
$2/m2
7
leveling the wall plastering material cost
$0.3/m2
$2.6/m2
8
ergonomics
20m2/day
15m2/day
9
final ecomic indicators
$5.9-6.4/m2
$12-13/m2

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 2

No need for skilled workers

The Aluminum Formwork System is made of lightweight aluminum which allows the largest components to be
hand carried and set up. Even it does not need skilled workers due to the elaborate design provided to make
sure that our clients success must be achieved.

Cost reduction

A form designed for maximum reuse may have to be stronger and more expensive than one designed for a
single use, but it can save a great deal on the total form investment. Extra features that make erection and stripping easier will add to original form costs, but labor savings may outweigh the extra cost by using  Aluminum Formwork System.

Faster construction

The Aluminum Formwork System is fast. It is not uncommon for a contractor to double or triple the output of their form crews when they convert from a wood faced form system to  Aluminum Formwork System.

Unparalleled quality

Quality control extends beyond our manufacturing plant.
We are actively engaged in custom design and engineering to improve our product line. We constantly re-evaluate our products, and regularly consult with contractors, builders, and distributors. We also conduct on-site training and inspections to ensure our clients' success.

Best technical support

Our Aluminum Formwork System is based on worldwide field experience and accumulated technical know-how. Whatever customers need, we will always fulfill their demands with the most appropriate system.With our R&D department continuously researching for newer and better products, we will maintain our leading position as the leader of Aluminum Formwork System against our competitors.

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 3

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 4

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 5

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 6


COMPANY PROFILE

Shandong Wanzhida New Materials Technology Co., Ltd. Was established in 2007, with a factory area of over 100000 square meters and annual sales exceeding 1 billion US dollars. At present, we have formed a closed loop from raw materials to products, achieving a green circular economy model of zero pollution and zero waste. In the manufacturing process, we not only strive to control costs, but also improve product quality. We have formed a professional manufacturer from raw materials to finished products, with a one-stop closed-loop production process from raw materials, surface treatment, machining treatment to finished products. We have a full process production and processing including horizontal cutting, vertical cutting, CNC laser cutting, frosting, 8K, oil grinding, embossing, machining, welding, assembly, etc. The company has longitudinal cutting equipment, leveling equipment, grinding equipment, oil grinding equipment, and embossing equipment, CO2 laser cutting machine, CNC bending machine, riveting equipment OTC welding robots, surface treatment, assembly lines, etc. Our manufacturing materials include stainless steel, steel, etc. Mainly used in products such as medical equipment, highways, food equipment, electronic and electrical equipment, airplanes, construction and installation industries, agricultural machinery, automotive parts markets, automatic parking facilities, logistics equipment, textile machinery equipment, machine tools, and various metal structure machinery equipment. Our team has over 14 years of work experience, relying on advanced manufacturing equipment and a sound quality management system to ensure that your products are 100% qualified and orders can be completed on time. Welcome customers to visit our factory.

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 7

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 8



PRODUCTIVE PROCESS

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 9



CUSTOMER

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 10


CERTIFICATION

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 11

Aluminium Formwork System Building Material Construction Concrete Pillar Formwork Molds 12


FAQ

Q1: Are you trading company or manufacturer ?
A: We are a manufacturer engaging in the field of metal products for more than 20 years.

Q2:How much is the freight ?
We will decide according to your mode of shipping and quantity, it needs you to provide us specific mode of transportation(by sea or air),which port or airport to arrive at.

Q3: Do you accept retail order? What is the MOQ required?
A: Yes, we accept retail order. MOQ is negotiable, free to contact us for discussion.

Q4: Do you provide ODM/OEM service?
A:Yes. OEM&ODM is available, you can show us the design plan, and it is better to ship us your original sample.
From the concept to finished goods, we do all (design, prototype reviewing, tooling and production) in the factory.

Q5:Can you provide samples?
A:Yes. We can ship your sample via DHL, UPS, Fedex, TNT, EMS etc. Please feel free to contact us for details

Q6. How do I place an order?
A: Please try to provide the following information:
* Product information: specifications, quantity, delivery requirements
*Payment
* Shipping information: name, detailed shipping address, phone number, shipping requirements (courier, air or sea).
* If there is a cooperative freight forwarder, please provide the contact information of the freight forwarder.
* Please send us an official purchase order by email. or we can  provide proforma invoices for you.





Our Products
Similar Products